Prepare Now: Michigan’s New Energy Code for Commercial Buildings Is Coming
Michigan’s New, Commercial Energy Codes
Effective April 22, 2025
Michigan is updating its commercial building energy codes to create more efficient, sustainable structures. These changes, based on the 2021 IECC and ASHRAE 90.1–2019, are expected to reduce energy use by 12%.
Explore the key updates below to ensure your building projects meet the new compliance standards.
Key Code Changes, at a Glance
Energy Monitoring:** Required for Electric, Gas, and Steam systems
Updated Standards:** Based on 2021 IECC & ASHRAE 90.1–2019
Envelope Commissioning:** Now required for all buildings
FPT Threshold:** Lowered from 50,000 to 10,000 sq. ft.
Energy Recovery Ventilators (ERVs):** Mandated in dwelling units
Why These, Changes Matter
The updates aren’t just regulatory — they’re a blueprint for building smarter and greener. By improving system performance and energy use tracking, these changes help reduce emissions and long-term operating costs.
It’s time to build for the future.
Functional Performance Testing (FPT)
FPT is now required for all commercial buildings (or significant alterations) 10,000 sq. ft. or larger. It ensures that HVAC, lighting, and other systems are optimized for energy efficiency, occupant comfort, and longevity.
FPT must be performed by a qualified third party not involved in the original system design or installation.
Solar-Ready & EV Infrastructure
The new code requires:
Structural provisions for future solar energy installations
Allocated space for panels
EV Charging Infrastructure for renewable-readiness and sustainability
This promotes Michigan’s shift toward greener transportation and cleaner energy use.