Skip to content
Consumers Energy Trade Ally · Davisburg, Michigan

Holland, Michigan

BuhlerPrince

Two objectives: reduce energy waste and reduce carbon. Networked lighting cut lighting from 19% of the bill to 3% and removed more than 281 metric tons of CO₂ a year.

19% → 3% Lighting share of the energy bill
281 t CO₂ removed per year
17% Fewer fixtures
25+ yr Expected lighting life

The full story

What the plant asked for — and what EDE delivered

BuhlerPrince and EDE had two objectives: reduce energy waste and reduce carbon. Lighting with network controls cut cost, improved the work environment, reduced lighting maintenance, and removes more than 281 metric tons of CO₂ annually. Lighting’s share of the monthly energy bill fell from 19% to 3%. Fixture count fell 17%. Expected life is over 25 years with virtually no maintenance. The plant has control over light levels and lighting behavior.

  • Implemented
  • NLC
  • Carbon

Primary offer

Want the same review in your plant?

Name, company, and a way to reach you. Tell us which system is keeping you up at night.

Prefer a call? (734) 215-1133

Or call (734) 215-1133. We typically reply within one business day.

Ready to find the waste hiding in your plant?

Request a 30-minute facility energy review. No long form. No generic pitch.

Request a 30-Minute Facility Energy Review
(734) 215-1133 info@energydesignengineers.com
Call EDE Request a 30-min review