BuhlerPrince

The Full Story

BuhlerPrince and Energy Design Engineers had two core objectives with this project; to reduce energy waste and reduce BuhlerPrince carbon footprint.

BuhlerPrince lighting with Network Controls implementation provided significant cost reductions, a much improved work environment, reduced the plants lighting maintenance costs and removes over 281 Metric Tons of Carbon Emission annually.

Additionally the project proved the following results:

  • Reduced their Lighting Energy Load from 19% down to 3% of their total monthly energy bill.
  • Reduced fixtures counts by 17% (Reduced cost of the project and improved energy waste reduction)
  • Implemented a lighting solution that requires virtually no maintenance throughout a life expectancy over 25-Years.
  • Provided BuhlerPrince with total control over plant light levels, lighting behaviors and more.

Key Metrics for The Project:

Total Square Footage
0 ft2
Ten Year Return on Investment
$ 0
Post Project kWh/Year
0 kWh
Metric Tons of CO2 Avoided
0
Baseline kWh/year
0 kWh
% Saved From Lighting Retrofit
0 %
Total Incentive Received
$ 0
% Saved Through implementing Controls System
0 %
kWh Saved/Year
0 kWh
% of Project Paid By Utility
0 %
Simple Payback Period
0
Need Energy Solutions ?

We’re just one message away. Let’s build something powerful.