Skip to content
Consumers Energy Trade Ally · Davisburg, Michigan
Boiler System Optimization Saves Manufacturer $180K Annually

EDE News · July 9, 2026

Boiler System Optimization Saves Manufacturer $180K Annually

Manufacturing Energy Savings One of the most rewarding parts of energy work is helping clients uncover savings that far exceed their expectations. Energy waste is often hidden inside…

Manufacturing Energy Savings

One of the most rewarding parts of energy work is helping clients uncover savings that far exceed their expectations.

Boiler and steam trap energy savings project

Energy waste is often hidden inside systems that appear to be operating normally. For many manufacturing facilities, boilers and steam systems are critical to daily operations, but they can also become a major source of unnecessary utility costs when they are not properly reviewed, sized, and maintained.

We recently worked with a manufacturing client that was experiencing significant inefficiencies in its boiler and steam system. After completing a field review of the site, it became clear that the existing boiler system was not properly sized for the facility’s actual needs.

The review also uncovered another major issue: 50 failed steam traps. These failed traps were allowing valuable energy and water to be wasted, creating avoidable operating costs and reducing overall system performance.

Projected Annual Savings

$180,000

Annual electric power savings

1.2 Million

Gallons of water saved per year

Solving the Root Problem, Not Just the Symptoms

By replacing the boiler system with a properly sized solution and eliminating the failed steam traps, the client is now positioned to reduce both energy consumption and water waste in a meaningful way.

Projects like this are a great reminder that real savings often come from stepping back, looking at the entire system, and identifying the root cause of waste instead of only treating the visible symptoms.

Why Field Review Matters

Proper system design, accurate field review, and the identification of hidden waste can deliver major operational and financial results for manufacturers.

Find Waste > Quantify Waste > Eliminate Waste > Verify Results

How Much Energy Is Your Facility Wasting?

Many manufacturing facilities lose thousands of dollars every year through oversized equipment, failed steam traps, compressed air leaks, inefficient lighting, and other hidden energy losses. The first step toward reducing operating costs is knowing where the waste exists.

Energy Design Engineers helps industrial and commercial facilities identify energy waste, quantify potential savings, and develop practical solutions that deliver measurable financial results.

Schedule an Energy Assessment

Discover how our proven approach helps manufacturers Find Waste → Quantify Waste → Eliminate Waste → Verify Results.

About the Author

Mark Wiley

Mark Wiley is the President of Energy Design Engineers (EDE), where he helps industrial and commercial facilities reduce energy consumption through engineering-driven solutions. His expertise includes energy audits, utility incentive programs, lighting systems, compressed air optimization, steam systems, HVAC, and industrial process improvements that deliver measurable operational and financial results.

Connect with Mark on LinkedIn →

Primary offer

Request a 30-minute facility energy review

Name, company, and a way to reach you. Tell us which system is keeping you up at night.

Prefer a call? (734) 215-1133

Or call (734) 215-1133. We typically reply within one business day.

Ready to find the waste hiding in your plant?

Request a 30-minute facility energy review. No long form. No generic pitch.

Request a 30-Minute Facility Energy Review
(734) 215-1133 info@energydesignengineers.com
Call EDE Request a 30-min review